Case Study

Commissioning Manager Staff Augmentation

US

An electrical contractor was short-staffed on a mission-critical facility construction project and needed short-term support to keep their project moving forward and prevent their staff from getting overwhelmed and burning out.

Download

Case Study

Commissioning Services for Cloud Operations Data Center

Amsterdam, Netherlands

CAI provided commissioning services for a 32 MW mission critical cloud operations data center. The project was a concurrently maintainable design (comparable to TIER III Design) and was completed in a record time of 15 months from equipment delivery to handover.

Download

Case Study

Commissioning Services for Greenfield Data Center

Dublin, Ireland

CAI provided third party commissioning services to bring a Greenfield build of a single story, 169,000 square feet, 17.6MW new Data Center colocation facility into operation within the assigned project schedule.

Download

Case Study

Commissioning Services for LEED Gold 36 MW Data Center

Wyoming, US

CAI was brought in to provide commissioning services for the design, construction, and fit-out of a LEED Gold certified 36 MW Data Center in Cheyenne, Wyoming. The turnover of the facility was performed in five different phases.

Download

Case Study

Construction & Cx Solutions for Greenfield Data Center Complex

Texas, US

CAI was engaged by the General Contractor (GC) to develop the installation and commissioning schedule, provide oversight of all commissioning deliverables, and coordinate all MEP contractor and vendor work activities.

Download

Case Study

Data Center Commissioning in a Live Environment

Dublin, Ireland

CAI provided third party commissioning services for retrofitted Evaporative Cooling systems simultaneously with a full-scale BAS software upgrade within the assigned project schedule and minimal disruption.

Download

Case Study

Data Center Commissioning Staff Augmentation

Dublin, Ireland

The client needed our team to join the project and be productive from the start to achieve the desired turnover date while maintaining or exceeding the required quality level.

Download

Case Study

Data Center Project Staff Augmentation

Texas, US

Rogers-O’Brien (RO) was hired to complete the construction of two 18mW data centers in San Antonio, Tx. RO required key personnel with enterprise data centers specific experience to meet the level of effort and coordination required to deliver these two projects with expected quality.

Download

Case Study

DC Cx App for Data Centers

Various Locations

CAI, powered by its tech partner CAI|Tech, developed an application called DC Cx App to improve overall commissioning project performance. The App collects equipment detail and reporting data and initiates process workflows that reduce labor costs and improve project efficiencies.

Download

Case Study

Generator Re-Commissioning in a Live Data Center Environment

Amsterdam, Netherlands

CAI initially provided temporary generator commissioning support for a 40 MW mission critical cloud operations data center. As a second phase of the project, once the impacted permanent generators were either replaced or repaired all site generators were re-commissioned.

Download

Case Study

New Enterprise Data Center Commissioning

New York, US

This project included building and commissioning a greenfield building with the data center on the first floor. The new enterprise data center is a raised-floor design occupying 21,000 square feet.

Download

Case Study

Phased Construction Approach Commissioning Services

Washington, US

A reserve bus was required to upgrade the Client’s reliability; therefore, installation and commissioning was incrementally carried out in a phased construction approach without impact to production loads. CAI staff were engaged in coordination activities from the beginning and provided valuable insight to protect the critical load.

Download

Case Study

Utility Substation Commissioning Services

Amsterdam, The Netherlands

CAI provided commissioning services for a greenfield build of a Utility Substation that provides electrical power to a multi-phase, mega-data center. At the time of commissioning, portions of the new substation’s switchgear were being used to power the first phase of the Data Center build, which was already operational.

Download